So far we have had two different inspectors and they have both been very reasonable. Inspector issues really worried me about this project. I'm really hoping our luck holds out in that regard.
We have picked out our new gas stove. Cabinet and granite installation is scheduled for next week. Here's a picture of our kitchen, newly painted.
| Plastered, textured, painted. |
All this time I've been trying to arrange things to get done as quickly as possible. Now that we have everything lined up to get things completed this week, there isn't really anything left we can or really need to do right now. So this morning I got new tires for Julia's car and helped my dad get his retaining wall on track to finish today. I did find couple things to do tonight, calking edges of walls (mostly for ants), and cleaned most the plaster and paint off the underlayment in the kitchen. The kitchen really will look a lot more open and inviting now. Here's a look at what things looked like with the previous owner. Notice the window was a few inches shorter.
![]() |
| Previous owner's kitchen. |

No comments:
Post a Comment